Accelerate Built Environments Office

41 NORTH CONTRACTORS

It was paramount to our team as we planned our expansion that the new space would both showcase DIRTT’s commitment to state-of-the-art manufactured construction solutions and, at the same time, create a highly performance work environment to support our growing team.

Embedded technology, writeable surfaces, and branding all provide the freedom for the high levels of collaboration and outside-the-box thinking needed to take on the dynamic challenges faced in the construction world head on as we help our clients build better with DIRTT!

DIRTT Solutions & Finishes:
Powdercoated Aluminum Frames, Veneer Wrapped Frames, Solid Walls, Cornice Height Walls, Embedded Technology Behind Back Painted Glass (including DISPLAX touch enabled film), Custom Graphic Willow Glass, Matte Writeaway, Back painted Glass Tiles, Veneer Tiles, DIRTT Millwork

Industry:
Corporate